Ship Repair
23.06.2025
Ship Repair

Qingdao Beihai completes intake boost refit for SFL’s ‘San F’ vessels

Qingdao Beihai Shipyard has rounded off a six‑month retrofit campaign on SFL Corporation’s DSME‑built sisters San Felix, San Felipe, San Fernando and San Francisca.

Undertaken during the ships’ planned ten‑year special surveys, the yard’s brief…

Ship Repair
23.06.2025
Ship Repair

Solvang to roll out carbon capture on four more vessels

Solvang, whose vessel Clipper Eris was retrofitted with a vast Wärtsilä carbon capture and storage (CCS) system last year, has made an agreement with Seatrium to retrofit CCS devices on four more gas carriers from late 2026.

“Building on the success…

Ship Repair
23.06.2025
Ship Repair

DNV launches new CCS de-risking specification

Following the conclusion of DNV's recent research on carbon capture and storage (CCS), DNV is seeking to ‘de-risk’ these investments with a new service specification (DNV-SE-0696) for the verification of CCS systems and facilities.

The measure…

Ship Repair
23.06.2025
Ship Repair

Trans Hav conversion a step closer to completion at BLRT

Estonia’s BLRT has completed many of the steps required to transform Trans Hav, one of two ice-class RoRo sister vessels receiving a series of upgrades to turn them into wind-solar-battery hybrids.

The yard reports that installation of the new solar…

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • …
  • 125